BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project
The proposed WHR system will efficiently utilize the waste heat from the clinker production process to generate electricity. The project developer plans to install one captive power stations (5.5 MW), based on waste heat recovery. The steam generated from the boilers will be sent to a turbine that feeds a generator for electricity production. Lifetime of the project is 20 years. The generated electricity will be consumed within the plant only, thereby substituting electricity for cement production that would otherwise be purchased from the Turkish power grid. The project will thus lead to indirect reduction of CO2 emission via reduced plant electricity consumption. The volume of this reduction is defined by the plants net electricity generation (32,620 MWh) and the respective grid emission factor of the Turkish power grid. . The figure is calculated by multiplying average power-self consumption of the system (%6.82) by annual electricity generation (35,000,0003 kWh).
Information
Country
TR
Available Carbon Credits
40000
Company
Batıcim Batı Anadolu Cimento Sanayii A.Ş
Company Address
Ankara Asfalti Uzeri, Naldoken Koyu No. 335, Bornova Izmir, Turkey
Blockchain Wallet
0x25a0aD522e1F885065B597EB06CAD3b898dF93Fa
Registry Name
Verra Carbon Standard
Time Period
500 Years
Method
Waste Heat Industrial Efficiency
Verification Report
Transactions
No Transactions
Vintage
Buy Carbon Credits and Offset carbon Footprints
1.54 USD/Tonne
Browse all the projects available on our platform
© 2025 — Copyright ZeroCarbon One
Zero Carbon One LLC
Zero Decarbon One Pvt. Ltd.