Village

BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project

Description

Ankara Asfalti Uzeri, Naldoken Koyu No. 335, Bornova Izmir, Turkey

BATISOKE Soke Çimento Sanayii T.A.S. 5.5 MW Cement WHR Project

The proposed WHR system will efficiently utilize the waste heat from the clinker production process to generate electricity. The project developer plans to install one captive power stations (5.5 MW), based on waste heat recovery. The steam generated from the boilers will be sent to a turbine that feeds a generator for electricity production. Lifetime of the project is 20 years. The generated electricity will be consumed within the plant only, thereby substituting electricity for cement production that would otherwise be purchased from the Turkish power grid. The project will thus lead to indirect reduction of CO2 emission via reduced plant electricity consumption. The volume of this reduction is defined by the plants net electricity generation (32,620 MWh) and the respective grid emission factor of the Turkish power grid. . The figure is calculated by multiplying average power-self consumption of the system (%6.82) by annual electricity generation (35,000,0003 kWh).

Information

Country

TR

Available Carbon Credits

40000

Company

Batıcim Batı Anadolu Cimento Sanayii A.Ş

Company Address

Ankara Asfalti Uzeri, Naldoken Koyu No. 335, Bornova Izmir, Turkey

Blockchain Wallet

0x25a0aD522e1F885065B597EB06CAD3b898dF93Fa

Registry Name

Verra Carbon Standard

Time Period

500 Years

Method

Waste Heat Industrial Efficiency

Verification Report

Transactions

No Transactions

Vintage

Buy Carbon Credits and Offset carbon Footprints

1.54 USD/Tonne

Village

Browse all the projects available on our platform