Description
Denizli Province, Babadağ District, Demirli Village, Turkey
Denizli Wind Power Project, Turkey
Korda Enerji Üretim Pazarlama Ithalat ve Ihracat A.S. (hereafter referred to as “Korda”) invested into a new Wind Power project called Denizli Wind Power Project (hereafter referred to as the “Project” or “Denizli WPP”), which involves installation and operation of 3 MWe wind turbines. An estimated electricity net generation of 186,100 MWh per year by the efficient utilization of the available wind energy by project activity will replace the grid electricity, which is constituted of different fuel sources, mainly fossil fuels. The electricity produced by project activity will result in a total emission reduction of 105,524 tonnes of CO2e/year.
Information
Country
TR
Available Carbon Credits
85000
Company
Korda Enerji Üretim Pazarlama İthalat ve İhracat A.Ş
Company Address
Denizli Province, Babadağ District, Demirli Village, Turkey
Blockchain Wallet
0x25a0aD522e1F885065B597EB06CAD3b898dF93Fa
Registry Name
Verra Carbon Standard
Time Period
500 Years
Method
Wind Energy
Verification Report
Transactions
No Transactions
Vintage
Buy Carbon Credits and Offset carbon Footprints
2.85 USD/Tonne
Browse all the projects available on our platform
© 2025 — Copyright ZeroCarbon One
Zero Carbon One LLC
Zero Decarbon One Pvt. Ltd.