Foundation Wind Energy-I Limited 50 MW Wind Farm Project
The purpose of the Foundation Wind Energy-I Limited 50 MW Wind Farm Project (hereinafter the “project activity” or the “project” or the “wind farm”) is to utilize wind resources for electricity generation through the construction of a wind farm with a total capacity of 50 MW and to deliver the electricity generated from the project to National Transmission & Despatch Company Limited (NTDC) through its central power purchasing agency on behalf of Water and Power Development Authority (WAPDA) distribution companies. By replacing the electricity supplied by the WAPDA grid, which is heavily dominated by fossil fuel fired power plants, with electricity generated from wind power the proposed project activity will achieve obvious greenhouse gas (GHG) emission reductions by avoiding CO2 emissions. The project owner is Foundation Wind Energy-I Limited (hereinafter FWEL-I) as mentioned below. The project activity involves the installation and operation of 20 wind turbines with unit capacity of 2,500kW, which will supply an average annual generation of 144,500 MWh to the WAPDA grid. The total installed capacity is 50 MW. The construction of the project started on 12/08/2013. The project was in full commercial operation on 11/04/2015. Since then, the operation of the project has been continued in accordance with the project design as well as the description in the registered PDD. The CDM registration date was 31/12/2012. The start date of crediting period has been changed to be 11/04/2015 (formerly 01/01/2014) , it has been approved by CDM EB on 13/11/2016. Therefore, the crediting period is 11/04/2015 – 10/04/2025 (Fixed).
Information
Country
PK
Available Carbon Credits
107436
Company
Foundation Wind Energy-II (Private) Limited
Company Address
Mirpur Sakro District Thatta, Province of Sindh, Pakistan
Blockchain Wallet
0x25a0aD522e1F885065B597EB06CAD3b898dF93Fa
Registry Name
Gold Standard for the Global Goals
Time Period
500 Years
Method
Wind Energy
Verification Report
Transactions
No Transactions
Vintage
Buy Carbon Credits and Offset carbon Footprints
1.66 USD/Tonne