Description
Kangal and Gürün districts of Sivas province in Turkey
Kangal Wind-Solar Hybrid Power Plant
Kangal Wind Power Plant is located in Kangal and Gürün districts of Sivas province in Turkey and developed by Kangal Elektrik Enerji Üretim ve Ticaret A.Ş.. The project involved 63 wind turbines (43x(2 MWm / 2 MWe) + 20x(2.1 MWm / 2.1 MWe)) . Kangal Enerji Üretim ve Ticaret A.Ş. is investing into a Solar project, which will be operated as a hybrid system by integrating to the wind power project. Kangal Project consists of 50 MWm SPP in addition to the 128 MWm/ 128 MWe WPP as of 5th October 2021 . The purpose of the project is to generate electricity and to feed it into the Turkish National Grid. The installed capacity of the project is 128 MW and annual gross electricity production of the project is 414,873.6 MWh/y . The annual emission reductions will be CO2 and are estimated to be approximately 224,032 tCO2/year . With the integration of solar system to the project, annual gross electricity production of the project will be 512,000 MWh/y and annual emission reductions will be approximately 276,480 tCO2/year
Information
Country
TR
Available Carbon Credits
105000
Company
Kangal Elektrik Enerji Üretim ve Ticaret A.Ş
Company Address
Kangal and Gürün districts of Sivas province in Turkey
Blockchain Wallet
0x25a0aD522e1F885065B597EB06CAD3b898dF93Fa
Registry Name
Gold Standard for the Global Goals
Time Period
500 Years
Method
Solar Energy
Verification Report
Transactions
No Transactions
Vintage
Buy Carbon Credits and Offset carbon Footprints
1.53 USD/Tonne
Browse all the projects available on our platform
© 2025 — Copyright ZeroCarbon One
Zero Carbon One LLC
Zero Decarbon One Pvt. Ltd.