Description
Parnaiba, State of Piaui, Northeast of Brazil
Porto do Delta Wind Power Plant CDM Project
Porto do Delta Wind Power Plant CDM Project (PDWPP) consists of the construction and operation of a wind power plant with 30.8 MW of installed capacity that will supply clean electricity to the Brazilian National Interconnected System (SIN, from its acronym in Portuguese, “Sistema Interligado Nacional”). In spite of a great potential for their development, wind power generation activities, such as the Porto do Delta Project, so far only represent a small share of the Brazilian electric matrix. According to the National Electric Energy Agency (ANEEL, from its acronym in Portuguese, “Agência Nacional de Energia Elétrica”), wind power plants represent 12.6% of the country’s installed capacity. Given this context, projects like Porto do Delta represent an important renewable and clean non-conventional alternative for electricity generation and a valuable contribution to the diversification of the Brazilian energy matrix. The baseline scenario is the same scenario existing before the implementation of the project activity, that is, the electricity delivered to the grid by the project activity would have otherwise been generated by the operation of grid-connected power plants and by the addition of new generation sources, as reflected in the combined margin calculations according to “Tool to calculate the emission factor for an electric system”.
Information
Country
BR
Available Carbon Credits
15000
Company
Porto do Delta Energia S.A.
Company Address
Parnaiba, State of Piaui, Northeast of Brazil
Blockchain Wallet
0x25a0aD522e1F885065B597EB06CAD3b898dF93Fa
Registry Name
UNFCCC Clean Development Mechanism
Time Period
500 Years
Method
Wind Energy
Verification Report
Transactions
No Transactions
Vintage
Buy Carbon Credits and Offset carbon Footprints
1.86 USD/Tonne
Browse all the projects available on our platform
© 2025 — Copyright ZeroCarbon One
Zero Carbon One LLC
Zero Decarbon One Pvt. Ltd.